Boundary Creek Pipeline Detailed Design

Boundary Creek Stock Pipeline is a key project for Barwon Water, facilitating the supply of raw water to a number of landowners in the Yeodene region to supplement flows taken from Boundary Creek.

The project involved the concept and detailed design of 7 km of PE pipeline. This included a pressure reducing station at an offtake to the existing Barwon-Colac Raw Water Supply pipeline that could cope with large pressure variations, as well as flow control devices at each of the landowner connection points. CMP worked with Barwon Water’s project managers, survey team, environmental team, and a number of key stakeholders to deliver this project on time and within budget.

More Projects