CMP completed concept, functional and detailed design of the Pakenham Main SPS and Inlet Works upgrade to take the capacity from approximately 130 L/s to 415 L/s using the existing site.
This required a significant amount of detailed hydraulic analysis to determine the optimum screen velocities and determine how the capacity of the existing system could be significantly increased without the need to duplicate building footprints.